Just starting spoons
I just made my first spoon last night, made a almost functional pipe, but thermal shock killed it, I want to set up make about 20 of them. Would the best way to prep? Im thinking 10" 26mm sections with blowtubes on both ends using 12-13 mm for blowtubes, and splitting the 26 then into 2 5" pieces. I hate mixing metric and standard measurements too much to figure out this early. Thanks for any input.
Sent from my SM-G965U using Tapatalk |
You could learn how to pull points. That save you the money on 12mil tubing.
|
Pulling points will help. Also, consider 35 to 38mm tubing.
|
All times are GMT -7. The time now is 11:30pm. |
Powered by vBulletin® Version 3.7.5
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.