We were busy over the holidays! We installed 5 of the 6 new windows (for some reason one did't ship with the others), ran all of the electric, insulated the walls using the recycled denim, installed vapor barrier, drywalled, insulated the ceiling (with traditional stuff),and almost finished the ceiling. We just flat ran out of oomph. Oh, and we picked out and bought our flooring. I'll likely have to put the pictures into separate posts.
__________________
Sheri
Be Curious. Not judgmental.
|