Quote:
Originally Posted by Lorraine Chandler
Thank-you for the layout diagram .
Our property was recently rezoned by FEMA and they have determined any building with electrical has to have an 18" concrete footing and all of the electrical has to be at least 36 inches off the ground and I have to hire an engineer to oversee the whole project!!!
|
I don't know if it woks the same in the US but in Canada if you don't have a permanent foundation for your building you don't have have it inspected.
My last studio was in a small house we skidded onto our property & left on the skids & my current studio is a travel trailer I bought for under $1000. Neither had to be inspected & that made a huge difference in time & money.
Your studio looks great by the way.